General Boat Repair |
This photo shows the back of a Wilson Flyer with terminal transom rot, if you look closely you will also see that the full width engine drain well has been cut out and removed.
|
|
This photo shows part of the rotten deck, a total 2.5 meters (8ft) of deck had to be removed |
|
This Photo shows the new plywood (WBP BS1088) transom insert fitted, the semi circle cut out at the bottom is to allow for a transom drain plug to be fitted. You will also notice the floor has been removed and you can see where the full width engine drain well has been removed by looking at the side of the deck. |
|
This photo shows the now glassed in plywood insert. The new floor is fitted but not glassed in, the square hole in the floor is the new drain sump. |
|
This photo shows the glassed in floor, the refitted engine drain well the two framed areas (in the grey gel) are to take the fuel tanks. |
|
This photo shows the finished job, new deck, new transom wood, drain sump, fuel tank areas, refitted drain well and a non slip finish to the deck |
|
This last photo shows a newly fitted steering consul and control mounting panel. |
|
|
Boat repair – Shetland saker rebuild coming soon
|
|
|